Completed Projects

Here is an overview of some of the typical projects we have completed for clients since we established in 2000.

MCTV

Installation of studio at MCTV for Timeline TV.

Al Jazeera London

Relocation of Al Jazeera London to The Shard for ATG Danmon.

SIS relocation

Relocation to MediaCityUK in Manchester and Milton Keynes. Providing studio, post production and technical facilities.

Scottish TV

Relocation to Pacific Quay. 30 racks, 2 TV Studios, 5 dubbing suites and 11 edit suites.

MUTV

Installation of studio at MUTV for C2S Systems.

BT Vision

Facilities for VSC Design at BT Tower.

SIS Live

Wiring and fit out of OB14 at DIS premises for SIS Live.

The Farm Group

17 offline/online edit suites and grading suite, 2 Protools audio studios.

Sony America for NBC

Prebuild at DIS workshop and installation at Olympic Park for the 2012 Games.

Discovery Europe

For Ascent Media at Chiswick Park. 120 racks, transmission area, lines room and 12 Avid/Ingest rooms.

Premier Cabling Installation Provided in UK

Large Premises for Prebuild Cable Production

Experienced Wireman Available for Onsite Support